Jane S International Defense Review

Author:
Publisher:
ISBN:
Size: 16.12 MB
Format: PDF, ePub
View: 6777
Download Read Online
A tracked self-propelled howitzer is not sought The new system will become
operational in strength around 2008-10. • Land 40 Phase 1 - the army will
acquire a number of shoulder- launched assault weapons with the dual ability to
engage a variety of armored fighting vehicles (AFVs) and hard targets such as
bunkers, reinforced earth emplacements and targets behind masonry structures.
The new weapon will be issued to infantry battalions, the Special Air Service
Regiment (SASR) ...

Jane S Fighting Ships

Author: Frederick Thomas Jane
Publisher:
ISBN:
Size: 17.98 MB
Format: PDF, Mobi
View: 4592
Download Read Online
Type Active Building 52 Logistic Support Flight (Almirante lzar Naval Air Basel: (
Reserve) Fokker F-28s. Patrol Submarines 3 — Destroyers 5 — Marine Corps
Frigates 9 — Patrol Ships 7 - Personnel: 2,800 Fast Attack Craft (Gun/Missile) 2 -
2nd Marine Infantry Battalion (Puerto Belgranol Coastal Patrol Craft 6 — 3rd
Marine Infantry Battalion (Zaratei LSDs - 1 (1) 4th Marine infantry Battalion
lUshuaiai Survey/Oceanographic Ships 4 - 5th Marine Infantry Battalion lTrainingi
lRio Grendel ...